Wella Climazon Millenium Manual Install
Here is useful, practical content regarding the installation of the Wella Climazon Millennium (a professional hair processing machine / dryer).
Part 3: Post-Installation Testing & Calibration
Once physically installed, perform these verification checks: wella climazon millenium manual install
Pedestal (Mobile) Version: Ideal for salons that need to move the device between different styling stations. Here is useful, practical content regarding the installation
Step 1: Base Assembly
- Lay the heavy base on its side.
- Insert the four casters (wheels) into the sockets. Press firmly until you hear a click, or screw them in if using threaded casters.
- Stand the base upright. Lock two of the casters (usually the front two) to prevent rolling during assembly.
If you encounter a variant not covered here (e.g., the older "Climazon Plus" or the newer "Climazon Professional"), the installation logic remains the same: Base → Pole → Arm → Hood → Wires. Lay the heavy base on its side
For detailed technical diagrams and maintenance instructions, you can refer to the official Climazon Operational Guide provided by Wella Professionals.
3. Electrical Dry-Run Safety Check
- Manual voltage selection (110V / 230V) – unit is often dual-voltage but needs internal jumper setting.
- Feature provides a wire-by-wire connection diagram for the terminal block (L, N, Ground) with color-coded annotations.
- Includes a non-contact voltage tester validation step before final tightening.
- Live (Brown) → Terminal marked L
- Neutral (Blue) → Terminal marked N
- Earth (Green/Yellow) → Terminal marked ⏚ (Earth symbol)