Virar-alibaug Multimodal Corridor Route Map
Virar-Alibaug Multimodal Corridor Route Map: A Game-Changer for Maharashtra's Infrastructure
- Ends at: Kharphata (Near Alibaug/Revdanda).
- This connects directly to the coastal roads leading to the Mumbai Trans Harbour Link (MTHL) entry points, effectively bypassing South Mumbai congestion.
Space reserved for water mains, gas pipelines, and fiber optic cables. Crescera Group Visualizing the Corridor
Ending Point: Balavali/Chowk (near Alibaug) in Raigad district. virar-alibaug multimodal corridor route map
2. The Western Run: Vasai-Virar Region
Moving south, the route map crosses the Vasai Creek. This requires a significant bridge (or bund) connecting the mainland to Vasai Island. Key nodes on the map here include:
Toll Projections: Recent reports suggest a proposed toll ranging from ₹765 to ₹1,000 for the full stretch. I can provide more specifics if you tell me: Ends at: Kharphata (Near Alibaug/Revdanda)
The Mumbai Metropolitan Region (MMR) has witnessed rapid urbanization and population growth, leading to increased pressure on its transportation infrastructure. The existing transportation networks are often congested, inefficient, and inadequate to meet the growing demands of the region. The VAMC project addresses these challenges by providing a modern, integrated, and sustainable transportation solution.
The proposed Virar-Alibaug Multimodal Corridor will stretch over 60 km, passing through the districts of Palghar and Raigad. The corridor will originate at Virar, a major city in the Palghar district, and terminate at Alibaug, a popular tourist destination in the Raigad district. The route map of the VAMC includes: Space reserved for water mains, gas pipelines, and
The corridor starts at Navghar (Virar) in the north and ends at Alibaug in the south. It serves as a vital bypass for Mumbai, linking several major infrastructure hubs: