Saudi Aramco Schedule G =link= (2025)
If you meant a different Schedule G (e.g., within a specific regulatory filing), let me know, but this matches the most common financial/legal reference.
Here is a comprehensive guide to understanding the legacy and current reality of Schedule G. saudi aramco schedule g
Typically, materials falling under this schedule were characterized by: If you meant a different Schedule G (e
Contractor-Supplied Items: Outlines the specific materials and tools the contractor must provide. It mandates a preference for Saudi vendors and manufacturers . Standard definition (acts of God, war, strikes)
3.6. Force Majeure
- Standard definition (acts of God, war, strikes).
- Seller must notify within 7 days.
- If FM lasts >30 days, Aramco may terminate.
- The Process: The contractor submits a Job Safety Analysis (JSA) and Risk Assessment. The Aramco Area Authority reviews it. The contractor cannot lift a tool until the permit is signed.
- Hot Work: Welding, grinding, or any spark-producing activity requires a separate Hot Work permit, a gas test certificate, and a fire watch (with a 20-minute pre-job briefing).
- Penalty for Violation: Working without a valid permit is a "Zero Tolerance" violation. The first offense typically results in a $10,000 fine and the removal of the offending supervisor from site.
Non-Conformance Management: It sets strict protocols for how mistakes are identified, reported, and corrected. Mandatory Quality Personnel Requirements
4. Personal Protective Equipment (PPE) – Clause 8
Schedule G is famous for exceeding international norms. A typical OSHA site might allow high-visibility vests. Schedule G demands Type R Class 3 flame-resistant (FR) coveralls.