The Maharashtra Public Works Department (PWD) District Schedule of Rates (DSR) for 2017-18 came into effect on September 22, 2017. This schedule provides standardized rates for construction materials and labor used in government projects across all districts of Maharashtra. Key Basic Material Rates (Excluding GST)

To use the PWD DSR 2017-18 Maharashtra, follow these steps: pwd dsr 2017-18 maharashtra

The 2017-18 edition introduced several specific changes compared to its predecessors: Rate: ₹48 – ₹65 per square meter

Bridge Infrastructure: The Silent Crisis

The DSR listed 8,450 major and minor bridges under PWD jurisdiction. Of these, 327 bridges were flagged as "structurally distressed" (categories III and IV). The review prioritized 89 bridges for immediate reconstruction, primarily in the Kolhapur, Ratnagiri, and Thane districts, where older British-era girder bridges were still in use. Item 2

  • Item 2.4.1: Filling available excavated earth (compacted)

    Core boxes for samples, permeability tests, and water intake tests. Administrative Details Implementation : For road and building works, the e-DSR for 2017-18

  • Item 7.2.2: Shuttering for columns (height 3m-4.5m)